Electricity distribution

Electricity distribution scorecard

A quick look at how New Zealand's electricity lines companies (EDBs) compare on cost, reliability, losses and looking after their assets, allowing for how big and how spread out each network is.

Scores at a glance

Score
Out of 100, where 100 is best and 50 typical. Size and density are allowed for.
Band
The range covers the middle 90% of ranks as we randomly vary the four dimension weights. Strong or Weak means that whole range stays in the top or bottom third.
Groups
Thirds by ICPs per km of line: sparse below 7.5, intermediate 7.5–12.6, dense 12.6+.

Scroll the table sideways for the scores.

Scores out of 100, higher is better, compared with all EDBs, grouped by network density
EDB√(ICPs×km) ICPs/kmOverallBand (rank range)Cost25%Reliability25%Utilisation and losses25%Asset management25%
Sparse below 7.5 ICPs/km
OtagoNet OtagoNet Poor-condition grades likely on the wrong scale: Pole Mounted Transformer 2024 (0.32% vs usual 39%); Wood poles 2025 (0.0042% vs usual 24%). Without those years: asset score 32 (not 34), rank unchanged.9,477 4.274Strong 1–580849634
The Power Company The Power Company Poor-condition grades likely on the wrong scale: Wood poles 2025 (0.011% vs usual 24%). Without those years: asset score about the same, rank unchanged.18,210 4.270Strong 1–480757054
Scanpower Scanpower No zone substations: takes supply from Transpower at distribution voltage, so step-down losses and costs sit upstream. Flatters its loss ratio and cost.2025 loss ratio 0.4% vs usual 7.3%: implausible, likely a disclosure error. Scored on the five-year median, so no effect.2,664 6.463Strong 4–871824356
Centralines 4,120 4.957Middle 6–1588414157
Network Waitaki 5,052 7.052Middle 7–2027844849
The Lines Company 10,326 5.450Middle 9–1938415764
Firstlight Network 10,119 6.549Middle 8–258874556
EA Networks 8,062 6.643Middle 10–2712911851
Buller Electricity 1,767 7.439Middle 19–2721165958
Westpower 5,601 6.429Weak 25–2916571626
Intermediate 7.5–12.6 ICPs/km
Powerco 101,624 12.366Strong 1–682685064
Network Tasman 12,504 11.360Middle 4–1598624632
Northpower 19,718 10.253Middle 5–2157116479
Waipa Networks Waipa Networks Poor-condition grades likely on the wrong scale: Distribution OH Open Wire Conductor 2024 (0.027% vs usual 4%); Distribution OH Open Wire Conductor 2025 (0.027% vs usual 4%). Without those years: asset score 45 (not 49), rank 17 (not 16).No zone substations (has 33 km of subtransmission): takes supply from Transpower at distribution voltage, so step-down losses and costs sit upstream. Flatters its loss ratio and cost.8,145 12.450Middle 9–2375126249
Horizon Networks 8,132 9.745Middle 12–2677272948
Alpine Energy 12,118 7.745Middle 10–2611844836
MainPower NZ 15,129 8.442Middle 18–2654433238
Marlborough Lines 9,669 7.739Middle 16–277704830
Top Energy 11,873 8.026Weak 27–291604346
Dense 12.6+ ICPs/km
Nelson Electricity Nelson Electricity 91% underground. Reliability isn't adjusted for undergrounding, so the score keeps any benefit; the capital cost is in totex via a RAB of $30,653 per √(ICPs × km) (median $25,103).1,662 31.369Strong 2–577867045
Orion NZ 50,920 18.460Middle 3–14461004353
Wellington Electricity 28,949 35.956Middle 7–1773793837
Unison Networks 33,238 12.651Middle 7–1854297350
WEL Networks 23,575 17.450Middle 10–1745396255
Electra 10,482 19.550Middle 12–1750435949
Electricity Invercargill Electricity Invercargill 92% underground. Reliability isn't adjusted for undergrounding, so the score keeps any benefit; the capital cost is in totex via a RAB of $32,064 per √(ICPs × km) (median $25,103).3,416 26.446Middle 16–2254305943
Aurora Energy 24,298 15.040Middle 15–275394374
Vector Lines 108,422 31.139Weak 22–2523364354
Counties Energy 12,880 13.237Weak 21–2825144563

· 50 is typical · click an EDB for its detail

What stands out

  • The top is fairly settled. OtagoNet, The Power Company, Nelson Electricity, Powerco and Scanpower are in the top quarter almost whatever the weighting (97–100% of weightings), and no one beats any of them on everything.
  • The bottom is pretty settled. Westpower and Top Energy stay in the bottom five however you weight the scores (at least 95% of weightings), and 9–15 EDBs do better than each of them on everything.
  • Most are too close to call. Only 5 EDBs stay in the top third and 4 in the bottom third across the middle 90% of weightings. The other 20 overlap too much to put in order (a typical rank range is 9 places), so treat them as a group.
  • A good overall score can hide a weak spot. OtagoNet (asset management 34) and Northpower (reliability 11) rank in the top half but have one area 30+ points below their overall score. Averaging lets the strong areas cover for it.
  • Most all-round. The Power Company has no weak spot: its lowest score is 54 (asset management). Every other top-ten EDB has something at 50 or below.

One EDB against the rest

OtagoNet

OtagoNet Sparse networks: 4.2 ICPs per km, 19,312 ICPs, 4,653 km of circuit, 5.5% underground.Consumer trust (via TPCL); price-quality regulated.In the top quarter in 100% of weightings; no EDB beats it on everything.Poor-condition grades likely on the wrong scale: Pole Mounted Transformer 2024 (0.32% vs usual 39%); Wood poles 2025 (0.0042% vs usual 24%). Without those years: asset score 32 (not 34), rank unchanged.
overall
74 rank 1 of 29
band (rank range)
Strong 1–5
sparse networks
67 rank 1 of 10

OtagoNet other EDBs median top quarter of all EDBs typical for its size and density (1.00×) better →

Cost80

Opex per ICP

$555 as disclosed · log scale

0.67×percentile 100

Totex with capital services per √(ICPs × km)

$3,922 as disclosed · log scale

0.96×percentile 61

Reliability84

Unplanned SAIDI (class C)

204 min as disclosed · log scale

0.56×percentile 86

Unplanned SAIFI (class C)

2.11 as disclosed · log scale

0.67×percentile 82

Utilisation and losses96

Loss ratio

3.9% as disclosed · log scale

0.81×percentile 100

Maximum demand ÷ distribution transformer capacity

0.28 as disclosed · log scale · capped at 0.4

1.17×percentile 93

Asset management34

Assets installed before 1980 (45+ years old)

2025 disclosure

23.5%percentile 71

Assets in poor condition (grades H1–H2)

11.5%percentile 14

Renewal capex ÷ network depreciation

capped at 1.5

0.95percentile 43

Totex forecast error

17.9% as disclosed · log scale

1.68×percentile 7
Values for every EDB (adjusted)
Values as scored for every EDB and scored measure
EDBOpex /ICPTotex /unitUnplanned SAIDIUnplanned SAIFILossesDemand ÷ capacity45+ years oldPoor conditionRenewal ÷ depnForecast error
OtagoNet0.67×0.96×0.56×0.67×0.81×1.17×23.5%11.5%0.951.68×
The Power Company0.71×0.94×0.53×0.87×1.00×1.41×32.6%3.8%0.820.55×
Nelson Electricity0.77×0.96×0.56×0.56×0.94×1.06×39.6%0.3%0.560.85×
Powerco0.83×0.89×0.76×0.74×1.00×1.02×25.7%5.9%1.220.68×
Scanpower0.91×0.91×0.73×0.42×0.96×0.94×9.7%9.9%1.041.03×
Orion NZ1.04×1.00×0.29×0.37×0.93×0.89×28.7%1.3%0.720.89×
Network Tasman0.70×0.66×0.77×0.81×1.09×1.06×37.1%1.7%0.851.99×
Centralines0.83×0.81×0.99×1.22×0.95×0.90×30.5%5.3%1.500.98×
Wellington Electricity0.87×0.92×0.61×0.72×1.12×1.05×43.2%5.0%0.961.06×
Northpower1.13×0.85×1.99×2.35×0.96×1.06×23.8%4.3%1.500.60×
Network Waitaki1.21×1.10×0.46×0.73×0.97×0.99×24.8%5.5%1.261.58×
Unison Networks1.00×0.97×2.30×0.98×0.84×1.00×26.0%13.3%1.340.91×
WEL Networks1.03×1.06×1.20×1.14×0.92×1.00×26.2%0.4%0.981.25×
Electra1.04×0.97×0.87×1.29×1.06×1.11×30.6%3.5%1.091.17×
The Lines Company1.06×1.08×1.04×1.18×1.11×1.22×28.2%3.0%1.190.87×
Waipa Networks0.95×0.83×2.02×1.46×0.91×0.99×11.7%4.2%0.851.70×
Firstlight Network0.83×0.82×2.63×2.02×1.13×1.07×32.3%7.3%1.500.75×
Electricity Invercargill0.93×1.06×1.15×1.38×1.06×1.14×31.5%14.5%1.030.62×
Horizon Networks0.89×0.86×1.41×1.35×1.02×0.91×28.2%7.6%0.880.67×
Alpine Energy1.39×1.13×0.72×0.50×0.85×0.80×32.7%18.9%1.501.08×
EA Networks1.18×1.48×0.42×0.62×1.49×0.96×5.8%4.1%0.701.26×
MainPower NZ0.97×0.98×1.40×0.91×0.95×0.80×20.1%11.1%0.721.16×
Aurora Energy1.37×1.17×0.93×1.34×1.10×1.05×23.8%6.4%1.500.61×
Marlborough Lines1.30×1.22×0.73×0.78×0.82×0.79×26.4%10.8%0.631.03×
Vector Lines1.06×1.17×1.49×1.13×0.98×0.97×23.2%4.8%1.121.57×
Buller Electricity1.24×1.11×2.00×1.40×0.86×0.95×26.9%2.5%0.760.72×
Counties Energy1.12×1.15×1.59×2.21×0.92×0.86×9.4%7.6%1.501.24×
Westpower1.33×1.13×0.87×0.90×1.19×0.92×11.8%24.7%0.401.40×
Top Energy1.22×1.17×3.59×2.42×1.33×1.09×22.7%8.1%0.700.90×

What good looks like

Scroll the table sideways for the density groups.

What good looks like, as disclosed, by density group
MeasureAll EDBs29 EDBsSparse networksbelow 7.5 ICPs/km, 10 EDBsIntermediate networks7.5 to below 12.6, 9 EDBsDense networks12.6 ICPs/km and above, 10 EDBs
Cost
Opex per ICPlower is better$553 / $399 $726 / $587 $551 / $472 $384 / $296
Totex with capital services per √(ICPs × km)lower is better$4,353 / $3,815 $4,197 / $3,826 $3,770 / $3,628 $4,569 / $4,311
Reliability
Unplanned SAIDI (class C)lower is better170 min / 98 min 199 min / 113 min 212 min / 149 min 94 min / 39 min
Unplanned SAIFI (class C)lower is better1.62 / 1.13 1.86 / 1.29 1.77 / 1.42 1.16 / 0.54
Utilisation and losses
Loss ratiolower is better5.0% / 4.5% 6.9% / 5.1% 5.2% / 4.8% 4.6% / 4.1%
Maximum demand ÷ distribution transformer capacityhigher is better0.27 / 0.29 0.25 / 0.28 0.26 / 0.27 0.30 / 0.35
Asset management
Assets installed before 1980 (45+ years old)lower is better26.2% / 23.2% 25.8% / 14.7% 25.7% / 22.7% 27.5% / 24.4%
Assets in poor condition (grades H1–H2)lower is better5.5% / 3.8% 5.4% / 3.9% 7.6% / 4.3% 4.9% / 1.8%
Renewal capex ÷ network depreciationhigher is better0.98 / 1.26 0.99 / 1.24 0.85 / 1.22 1.06 / 1.29
Totex forecast errorlower is better9.0% / 7.0% 11.8% / 8.8% 10.1% / 6.4% 7.9% / 6.3%

· median / top quarter, 2021–2025 · better →

Method